Zhongke Leinao launches a compute-power-token platform, results unverified
The compute-power coordination platform is officially launched, but all key figures are company-reported; watch for operational validation.
Original event 2026-09-24
Zhongke Leinao launched its compute-power-token integrated platform at the World Manufacturing Convention, placing compute, tokens and electricity under one scheduling system.
According to QbitAI, the platform follows the company's "1+3" architecture. The company itself reports that a cross-region scheduling test spanning Shanghai, Wuhu and Urumqi kept control response within 200 seconds, achieved a 100% migration success rate and 98% energy-consumption prediction accuracy. These figures are vendor-reported and independently unverified.
The same report notes the Wanjiang AI Technology Industrial Park in Urumqi opened on September 17, with its first fused computing center exceeding 1,000P already in operation. Whether the scheduling capability holds up in real business over time remains to be shown by operating data.